| Making a wall frame |
![]() |
| Joining frame together with my class mates (I'm not shown here) |
![]() |
| Then I did some Gib fixing |
![]() |
| Gib Stopping |
![]() |
| Painting |
![]() |
| Stenciling |
![]() |
| In Plumbing I made a dust pan |
![]() |
| Welded together a money box |
![]() |
| Made a metal tool box |
![]() |
| In Joinery I made a mail box |
![]() |
| Designing my own table ends |
![]() |
| Designing my own table sides- pre sanding |
![]() |
| Finished Table - View 1 |
![]() |
| Finished Table - View 2 |
Here are some examples of before and after for a house painting job I did for a friend in Winter 2013
![]() |
| West Side of House - before |
![]() |
| West Side of House - after |
![]() |
| South Side of House - before |
![]() |
| South Side of House - after |
![]() |
| Chimney breast - before |
![]() |
| Chimney breast - before |
![]() |
| Chimney breast - after |
![]() |
| Chimney breast - after |
![]() |
| Garage - before (That's me on the left) |
![]() |
| Garage - after |
![]() |
| Garage roof - before |
![]() |
| Garage roof - after |
![]() |
| North of House 1- before |
![]() |
| North of House 1 - after |
![]() |
| North of House 2 - before |
![]() |
| North of House 2 - after |
![]() |
| Extension - before |
![]() |
| Extension - after |
![]() |
| East of House - before |
![]() |
| East of House - after |
| West side of Endeavour Primary School - after RAB board and CLD battens have been added. |
| North Side of school showing RAB boards and CLD battens I installed. |
| Another view of North side of school. |
| The underfloor heating hose installed at school, (installed by sub-contractor ), on top of the polystyrene floor I helped install and steel rebar at 5m grids |